We’re on a mission to become the world’s most valued metals and mining business – for the people who invest in us, the people we work and partner with, and the communities around us
Our business
We operate in 35 countries where our 60,000+ employees are working to find better ways to provide the materials the world needs
Our purpose in action
Continuous improvement and innovation are part of our DNA
Innovation
The need for innovation is greater than ever
We supply the metals and minerals used to help the world grow and decarbonise
Iron Ore
The primary raw material used to make steel, which is strong, long-lasting and cost-efficient
Copper
Tough but malleable, corrosion-resistant and recyclable, and an excellent conductor of heat and transmitter of electricity
Aluminium
Lightweight and infinitely recyclable, aluminium is found in everything from jet engines to electric vehicles to mobile phones
Bringing to market materials critical to urbanisation and the transition to a low-carbon economy
Oyu Tolgoi
One of the most modern, safe and sustainable operations in the world
Simandou Project
The world’s largest untapped high-grade iron ore deposit
Western Australia
While iron ore is central to our operations in WA, we have a diverse presence across the state, from salt, lithium, our diamond legacy and our promising copper-gold project
Providing materials the world needs in a responsible way
Climate Change
We’re targeting net zero emissions by 2050
Nature solutions
Our nature-based solutions projects complement the work we're doing to reduce our Scope 1 and 2 emissions
Enabling ESG transparency
Our START™ initiative tracks traceability and responsible production of Rio Tinto materials.
We aim to deliver superior returns to our shareholders while safeguarding the environment and meeting our obligations to wider society
2026 Third Quarter Operations Review
Announced on Wednesday 14 October 2026
Get the latest news, stories and updates
Supplying a new era of growth
AI, digital infrastructure and electrification are driving new demand for our metals and minerals
What is block caving?
An innovative underground mining method using gravity to help extract ore from deep copper and gold deposits
How aluminium is made and why it matters
The journey from red rock to the metal we use every day
Discover more about life at Rio Tinto
Graduates and interns
If you want to drive real change, we have just the place to do it
In-house consulting
Discover how our in-house consultancy team, PACE, offers a unique opportunity to help shape Rio Tinto from the inside
Available jobs
Join our team
A former aluminium foundry and processing site that operated from 1917 to 2006
To help minimise leaks from the cell, in 2020 we pumped leachate from the landfill cell and treated the brine material. In 2025, we began the next stage of the rehabilitation project, which involves excavating, sorting and disposing of the 38 000m3 landfill material at licenced facilities off-site and conducting earthworks to prepare the site for a future industrial use. We completed removal of the impacted materials in August 2026. We are now moving in the final phase of project, which includes backfilling the area, and removal of the tent expect this will be completed in Q1 2027. To manage risks associated with the ammonia content of the slag, we installed a 150m × 50m containment tent, as well as gas extraction systems and 24/7 air quality monitoring both on-site and in the surrounding areas. We regularly carry out environmental monitoring activities on-site and in the surrounding area, including:
To ensure the protection of workers on site, we implemented a monthly biological monitoring program to monitor potential exposure and safeguard the health of our personnel. Due to the site’s proximity to the Seine River and nearby spawning grounds for some fish species, we’re carefully monitoring any impacts on water quality and the local fish species, including heritage or protected fish species such as the European eel, bitterling, pike, bullhead, allis shad, spiny loach, dace, and possibly brook lamprey. Nuisance prevention has been a key priority since the very beginning of the project. This included the use of noise barriers during piling works and traffic management measures.
We’re completing the remediation work in full compliance with all applicable legal and regulatory requirements, under the oversight of DREAL, the French State's regional environmental authority, and the Municipality of Dammarie-lès-Lys. We continue to hold regular meetings with the Municipality’s technical services, providing opportunities to share updates on progress, discuss upcoming activities and address any questions or concerns. The project team works closely with local stakeholders and community organisations to monitor site access and occupancy, helping to ensure the safety and security of the site and surrounding areas.
We expect to complete the rehabilitation project in Q1 2027. Once remediation is completed, the land will be suitable for future industrial use and available for redevelopment in line with local planning regulations.