We’re on a mission to become the world’s most valued metals and mining business – for the people who invest in us, the people we work and partner with, and the communities around us
Our business
We operate in 35 countries where our 60,000+ employees are working to find better ways to provide the materials the world needs
Our purpose in action
Continuous improvement and innovation are part of our DNA
Innovation
The need for innovation is greater than ever
We supply the metals and minerals used to help the world grow and decarbonise
Iron Ore
The primary raw material used to make steel, which is strong, long-lasting and cost-efficient
Copper
Tough but malleable, corrosion-resistant and recyclable, and an excellent conductor of heat and transmitter of electricity
Aluminium
Lightweight and infinitely recyclable, aluminium is found in everything from jet engines to electric vehicles to mobile phones
Bringing to market materials critical to urbanisation and the transition to a low-carbon economy
Oyu Tolgoi
One of the most modern, safe and sustainable operations in the world
Simandou Project
The world’s largest untapped high-grade iron ore deposit
Western Australia
While iron ore is central to our operations in WA, we have a diverse presence across the state, from salt, lithium, our diamond legacy and our promising copper-gold project
Providing materials the world needs in a responsible way
Climate Change
We’re targeting net zero emissions by 2050
Nature solutions
Our nature-based solutions projects complement the work we're doing to reduce our Scope 1 and 2 emissions
Enabling ESG transparency
Our START™ initiative tracks traceability and responsible production of Rio Tinto materials.
We aim to deliver superior returns to our shareholders while safeguarding the environment and meeting our obligations to wider society
2026 half year results
Announced on Wednesday 29 July 2026
Get the latest news, stories and updates
Supplying a new era of growth
AI, digital infrastructure and electrification are driving new demand for our metals and minerals
What is block caving?
An innovative underground mining method using gravity to help extract ore from deep copper and gold deposits
How aluminium is made and why it matters
The journey from red rock to the metal we use every day
Discover more about life at Rio Tinto
Graduates and interns
If you want to drive real change, we have just the place to do it
In-house consulting
Discover how our in-house consultancy team, PACE, offers a unique opportunity to help shape Rio Tinto from the inside
Available jobs
Join our team
At our Yarwun Alumina Refinery, we’re building a hydrogen plant and retrofitting existing refinery equipment in a world-first, proof-of-concept project to reduce carbon emissions from the alumina refining process.
The Yarwun Hydrogen Calcination Pilot will demonstrate the viability of using hydrogen in the calcination process, where hydrated alumina is heated to temperatures of up to 1,000 degrees Celsius.
In a A$111 million partnership with Summit Hydrogen Gladstone, a 100% subsidiary of Sumitomo Corporation, and federal government’s Australian Renewable Energy Agency (ARENA) and Central Queensland Hydrogen Hub (CQHH), we’re building a 2.5MW electrolyser on-site to supply hydrogen to the Yarwun refinery, which Sumitomo will operate to supply more than 250 tonnes of hydrogen per year to the refinery.
We’re also retrofitting one of Yarwun’s 4 calciners so it can operate at times with a hydrogen burner.
Construction began in 2024, and we expect the hydrogen plant and calciner to be operational in H2 2026. If successful, the program could pave the way for global adoption of this technology.
This pilot plant is an important step in testing whether hydrogen can replace natural gas in Queensland alumina refineries. We have put the energy transition at the heart of our business strategy, and this is one of the ways we’re working towards decarbonising our operations. We are proud to be developing this new technology here in Gladstone, in partnership with Sumitomo Corporation, and with support from ARENA.”
- Armando Torres, Rio Tinto Aluminium Pacific Operations Managing Director